Challenge 

Needed to design a lean production system capable of ramping immediately and exponentially

Supply chain was very constrained by the pandemic requiring flexibility and creativity

Filling vials with solution at a high volume required automation

The system consisted of 300 individual sub-assemblies. It proved very difficult to find an FDA certified manufacturer with both electronics and fluidics expertise.

 

Outcomes

Within 4 days Evolve had a production line with semi-automated processing equipment

Within 10 days the production output was 10000 covid test kits per day

Within 60 days the production output was 50000 covid test kits per day

 

Evolve’s Value Proposition

Demonstrated ability to bring up a high volume lean manufacturing line in record time

Expert in designing tooling and setting up automation to handle a seamless ramp

Evolve’s systems are designed to respond to quickly changing conditions while maintaining the strictest FDA standards