What are the biggest risks when transferring manufacturing to a
One of the biggest risks when transferring manufacturing to a new supplier is losing the knowledge that never made it into the documentation. Mature products often rely on small process details, assembly techniques, calibration nuances, or supplier-specific knowledge that drawings and work instructions may not fully capture.
Common Manufacturing Transfer Risks
Beyond undocumented process knowledge, several other risks can affect a transfer:
- Supply chain disruption when components are re-sourced or new variation is introduced
- Quality regression during early builds at the new manufacturing site
- Schedule gaps if the transfer takes longer than expected
- Regulatory exposure if required process validation or design transfer activities are not properly managed
How to Reduce Transfer Risk
A successful transfer requires more than handing over drawings and placing purchase orders. A structured process should include side-by-side builds, first article inspections, process validation, adequate safety stock, and early involvement from the new manufacturer’s engineering team.
Evolve Manufacturing uses manufacturing engineering-led transfer processes designed to capture both the documentation and the practical knowledge required to build the product successfully. Many of Evolve’s programs have transferred from OEM internal production lines, offshore suppliers, or larger contract manufacturers.